top of page
loodsm.jpg

Ontdek de mogelijke projecten binnen deze thema's:

Greenport of Maassluis

Building on Maassluis’s legacy of maritime innovation, we are launching a 10-year technical learning program toward an energy-self-sustaining harbor. Together with residents, companies, and the municipality, we will develop and validate renewable energy systems through iterative prototyping, real-world testing, and knowledge transfer.

The program focuses on three technical domains: vessel retrofitting, energy-optimized harbor infrastructure (shore power, microgrids, storage), and net-zero wharf adaptations. Each combines theory with hands-on implementation, using Maassluis’s maritime engineering expertise. We learn through structured experimentation—establishing energy baselines, testing technologies in situ, measuring performance against KPIs, and documenting results. Every pilot, from solar arrays on historic wharves to retrofit designs for traditional vessels, generates data that strengthens both local capacity and the national harbor decarbonization roadmap.

In ten years, Maassluis will function as a living laboratory: a fully renewable harbor supported by proven technologies and a skilled workforce trained through direct participation in the energy transition.

loodsm3.jpg

Focus op materiaalinnovatie, circulariteit en het verduurzamen van de fysieke leer- en werkomgeving.

WhatsApp Image 2025-09-09 at 11.27.42.jpeg

Focus op energieopwekking, conversie, opslag en integratie van nieuwe energiedragers.

20250312_165736.jpg

Focus op systeemintegratie, organisatie en opschaling naar stad en haven.

Our Team.

Want to learn more or get in touch? Reach out to the team!

Facilitator

Elke Müller

DSC06819.jpg

Facilitator support

Abel Svejda

DSC06728.jpg

Facilitator support

James Delanghe

DSC07818.JPG

Latest News.

Latest updates from our Port of Maassluis Learning Community!

Visiting the Sea Salt battery!

Visiting the Sea Salt battery!

Visiting the sea salt battery of Dr. Ten.

8 september 2025

The first quarter has started!

The first quarter has started!

New JIP team started in Maassluis!

1 september 2025

Mede mogelijk gemaakt door onze waardevolle partners:

JTF-Logo_RGB_EN_zwart.png
gemdelft.png
gemmaassluis.png
JTF-alle-logos.jpg
logo_drten_nl_home.gif
EN-V-Co-funded-by_BLACK-OUTLINE.png
gemmaassluis.png
JTF-alle-logos.jpg
bottom of page